BC Construction Group is proud to announce the completion of Central Florida Preparatory School. The new, state-of-the art campus, located in Apopka, Florida, is a 45,000 SF, two-story, concrete tilt-up building nestled on a 6.5-acre site.

Designed to serve 600 Montessori and K-12 students, the new school features 35 classrooms, two STEM laboratories totaling 1,000 square feet, a 685-square-foot culinary kitchen, a 3,837-square-foot multi-purpose room, and a full green house. Additional specialty spaces support programs such as robotics, bio-medical, arts, music and drama, and engineering.