As part of American Tire Distributors’ (ATD) national rollout program, BCCG constructed ATD Colorado Springs. One feature of the building was the 4,750 sf of office space. This includes four offices, nine cubicles, one conference and training room, 1 break room, and two offices that oversee the warehouse interior.
Project Highlights
- Project:
- Office
- Type:
- New Construction
- Delivery Method:
- Design-Build
- Specifications:
-
- Tilt-up Construction
- Part of American Tire Distributors National Rollout
- 4,750 SF
- 4 offices
- 9 cubicles
- Conference and training room
- Break room
- 2 additional offices to oversee the warehouse interior
- Solutions:
Installed a retaining wall to level out the property rather than lowering the site elevation.